Migrate from Railway to Voroa
The four things you have to move when you leave Railway: the build, your variables, your database and your domain, and how each of them works on Voroa.
What this covers
A migration off Railway comes down to the same four pieces as any other platform move. The build has to work somewhere else, which usually means confirming your install and start commands rather than relying on the old platform’s detection. Your variables have to be recreated. Your database has to be dumped and restored, with writes paused while that happens. And your domain has to be repointed after the new service is live and holding a valid certificate, so users never see a broken page.
A step-by-step Railway migration guide is not available on Voroa today, and Voroa cannot read your existing project to copy anything across. The moving parts are covered individually below.